AKIS was asked to remove some newly installed spray applied waterproofing deck membrane from an area of the new bridge deck that was previously paved due to phasing. The GC required the removal of the membrane so it could form and pour concrete barrier.
AKIS utilized its ultra-high pressure pumps with a deck blaster to remove the membrane without damaging the remaining concrete.