AK Industrial Services was contracted to perform hydro-demolition to scarify the bridge deck removing .5” of concrete in order to provide a substrate suitable for placing polymer modified concrete.
AK utilized its ultra-high-pressure demolition equipment to remove the concrete and provide a roughened surface for placement of the polymer modified concrete.